What type of inspection should be performed after each use of sling load equipment?

Prepare for the Air Assault School Phase 2 Test. Sharpen your skills with multiple choice questions and detailed explanations for a successful test experience. Ready for your assessment!

The correct choice is the visual inspection. After each use of sling load equipment, conducting a visual inspection ensures that the equipment is free from any obvious signs of wear, damage, or defects that could affect its performance in future operations. This type of inspection allows personnel to quickly assess the overall condition of the equipment by checking components like slings, hooks, and attachments for any visible issues, such as fraying, corrosion, or cracks.

Visual inspections are critical as they help prevent accidents and ensure safety during aerial operations. Conducting this inspection immediately after each use allows for proactive maintenance and ensures that any potential problems are addressed before the equipment is used again. This type of inspection is essential for maintaining operational readiness and reliability of sling load operations.

Functional, load test, and weight limit inspections serve their own specific purposes in the context of sling load operations; however, they are not required after each use. Functional inspections check the operation of the system as a whole, load tests verify the equipment's capacity under stress, and weight limit inspections ensure the load does not exceed the equipment's specifications, but these do not replace the need for a thorough visual check after every use.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy